Skip to product information
1 of 8

XiNBEi Lighting

Brass Wall Sconces Set of 2 Gold Sconce Light for Living (Brass)

Brass Wall Sconces Set of 2 Gold Sconce Light for Living (Brass)

Regular price $221.99 USD
Regular price $221.99 USD Sale price
Shipping calculated at checkout.

⭐ Key Features

•MODERN DESIGN: Hardwired brass wall sconce balances clean industrial lines with traditional charm to create a beautifully balanced lighting source. The elegant brushed brass lamp body arm can support a range of transitional and modern white fabric shade that emits soft light, creating a warm atmosphere for your room. Wall sconce light fixture can be used in various indoor occasions to decorate your home.

•FEATURE: Indoor Wall lights features a square brushed brass finished back plate, a flared shape white fabric shade,a straight long arm and a decor knob at the bottom. The flared white fabric shade gives you a comfy feeling with its soft light and perfect for lighting general areas. This fabric wall lamps is set of 2 just and mounted vertical only.

•E12 BASE SOCKET: This gold sconces wall lighting suggest to takes one maximum 40 watt E12 base bulbs (incandescent, CFL or LED compatible). Bulbs not included.

•EASY INSTALLATION: Hardwired. Mid centery modern sconces wall decor set of 2 come with mounting hardware accessories and instruction for quick and easy installation.

•ETL LISTED. For any question on any replacement accessory, just feel free to contact us.


🛠️ Specifications

• Brand : XiNBEi Lighting
• Color : Brass
• Material : Iron, Linen
• Unit : 1 Count
• Included components : Mounting Hardware
• Item highlights : Fabric Shade, Hardwired Light Fixture, Indoor Brass Wall Lamp, For Bathroom Bedroom Kitchen Hallway Stairway Beside
• Number of items : 2
• Package quantity : 1
• Recommended uses for product : Reading
• Special features : Wall sconces set of 2
• Specific uses for product : Home
• Style : Modern
• Type : LIGHT_FIXTURE
• Item dimensions : H: 20.0 / L: 5.0 / W: 6.0
• Package dimensions : H: 7.6 / L: 14.3 / W: 13.3 (Weight: 4.63)


View full details